Skip to main content

Urgently Need for Engineering Manager

 Posting : 7 November 2012

Dear All,
PT Rajawali Swiber Cakrawala, EPCI Offshore Services Company based in Jakarta, urgently need the Engineering Manager for 1 yr contract basis.
Now PT. RSC has been performing 5 EPCI Offshore Projects as the MAIN CONTRACTOR in Indonesia region.
Work based will be in South Jakarta.

Job Responsibilities;
The Engineering Manager shall responsible for representing for the design engineering management of the Project. He will be focal point responsible for the Interface and coordination between Contractor, Company, and Engineering Subcontractors. The Engineering Manager will mainly have the following responsibilities:
-
Deliver the engineering execution plans and monitor and review implementation throughout the execution of the project
-
  Plan, direct and lead the design effort to formulate the most cost effective solutions
-  Implement the engineering management scope of work
-
Design engineering control and review
-
To provide support to the procurement, fabrication, construction and pre-commissioning activities
- Manages the change decision process for engineering design
-
Reporting to the Project Director/Manager
- etc.

Job Requirements:
- Min. 10 years of experiences in Detail Engineering Management work and as the Engineering Manager, especially for EPCI Project
- Age 45 years old maximum
- Engineering bachelor degree or Master Degree
- Fluently in English
We will interview any applicant who meet the requirements above only.
If you interest please send your application complete with CV, current photo and expected salary:

To: HRD Department
Email: albertus.aryanto@swiber.com


This Job Vacancy will be closed on 20 November 2012.
Thanks for your attention.

Best Regards,
Wisnu Wahjusaputra

Comments

Popular posts from this blog

DOWNLOAD BUKU: THE TRUTH IS OUT THERE KARYA CAHYO HARDO

  Buku ini adalah kumpulan kisah pengalaman seorang pekerja lapangan di bidang Migas Ditujukan untuk kawan-kawan para pekerja lapangan dan para sarjana teknik yang baru bertugas sebagai Insinyur Proses di lapangan. Pengantar Penulis Saya masih teringat ketika lulus dari jurusan Teknik Kimia dan langsung berhadapan dengan dunia nyata (pabrik minyak dan gas) dan tergagap-gagap dalam menghadapi problem di lapangan yang menuntut persyaratan dari seorang insinyur proses dalam memahami suatu permasalahan dengan cepat, dan terkadang butuh kecerdikan – yang sanggup menjembatani antara teori pendidikan tinggi dan dunia nyata (=dunia kerja). Semakin lama bekerja di front line operation – dalam hal troubleshooting – semakin memperkaya kita dalam memahami permasalahan-permasalahan proses berikutnya. Menurut hemat saya, masalah-masalah troubleshooting proses di lapangan seringkali adalah masalah yang sederhana, namun terkadang menjadi ruwet karena tidak tahu harus dari mana memulainya. Hal ters...

Leak Off Test

Prinsipnya LOT (leak off test) dilakukan untuk menentukan tekanan dimana formasi mulai rekah. Tujuannya: 1. Menentukan MASP (Max. Allowable Surface Pressure). Yaitu batasan max surface pressure yg boleh kita terapkan selama drilling operation, tanpa mengakibatkan formasi rekah (fracture). 2. Dengan mengetahui MASP, berarti juga kita bisa mengetahui Max. mud weight yg boleh kita terapkan selama drilling operation, tanpa mengakibatkan formasi rekah (fracture). 3. Menentukan Kick Tolerance. Yaitu maximum kick size yg masih bisa kita tolerir untuk dihandle. Parameter ini nantinya juga berperan untuk menentukan depth casing shoe yang aman dari sudut pandang well control issue. 4. Mengecek kualitas sealing antara cement dengan casing Tanya - BGP HSESupv. BGP.HSESupv@petrochina Dear all Saat masih di rig dulu saya sering mendengar istilah leak off test. dimana step2nya kira kira sebagai berikut 1. Cementing Job 2. TSK ,masuk string dan bor kurang lebih 3 meter dibawah shoe. 3. dilakukan ...

Shutdown System

Apa yang membedakan antara PSD dan ESD? Secara umum keduanya berfungsi "membawa" sistem pemroses ke "keadaan yang lebih aman". Namun secara spesifik PSD lebih ditujukan kepada sebab sebab Process Specific seperti: Overpressure di bagian hilir kompressor, temperatur tinggi di heater untuk fuel gas, level yang terlau rendah di slug catcher, dst. Sementara ESD lebih ditujukan untuk menanggulangi dampak dari suatu kejadian yang sudah terjadi: misalnya gas yang telah bocor, kebakaran kecil di technical room, kebocoran minyak di pipeline, dst. Kedua jenis shutdown ini dapat pula dipicu oleh spurious trip atau gagalnya sistem shutdown tanpa sebab sebab yang diketahui dengan jelas. lebih rendah levelnya dari PSD ialah USD, atau Unit shutdown. Perlu dicamkan penamaan bisa berbeda beda antar company, misalnya ada yang menyebutnya sebagai ESD1, ESD2, ESD3 dan seterusnya, ada yang menyebutkannya sebagai ESD, PSD, USD dan seterusnya. Tidak penting, yang penting pahami betul fi...