Skip to main content

Quality Manager for SaudiArabia!!

My client is one of the leaders in power plant construction projects. Please take a couple of minutes to look through this new position that my client is looking to recruit for.
If you believe you could be a fit for this senior position please get in touch. An Apology If this isn’t for you but I would appreciate it if you could pass this on to any friends / colleagues who could be a potential fit.

Designation: Quality Manager
Location : Jeddah/Dammam/Riyadh
• Scheduling, organizing and implementing project-specific QM measures during proposal preparation and project execution (planning and site phase) including preparing the required specialist QM proposal texts and project documentation
• Developing and implementing the Project Quality Plan (PQP), based on the QM system, considering individual project requirements
• Establishing the project quality audit plan internally as well as externally with suppliers / subcontractors
• Performing project quality audits
• Participation in project status meetings, design and engineering reviews
• Evaluating suppliers’ / subcontractors’ QM systems and their QM activities
• Reviewing and approving of all associated suppliers / subcontractors issued QA/QC documentation during project execution (planning and site phase)
• Supervision of site inspections and quality measures
• Monitoring and reporting the quality status and follow-up of non-conformance / corrective actions
• Interface with client quality representative
• Lead of site quality engineers
• Ensuring complete, correct and traceable QA/QC documentation including compliance with all checking and release procedures
• Creating and maintaining a culture of QA/QC awareness and effective use of the standards in the project.

If you feel this role matches your skill set, kindly send me your updated profile on p.baxi@huxley.com or call me on +91 22 67128442.


Best regards,
   

Palak Baxi
Oil & Gas Division
Huxley Associates

p.baxi@huxley.com
http://www.huxley.com

Comments

Popular posts from this blog

DOWNLOAD BUKU: THE TRUTH IS OUT THERE KARYA CAHYO HARDO

  Buku ini adalah kumpulan kisah pengalaman seorang pekerja lapangan di bidang Migas Ditujukan untuk kawan-kawan para pekerja lapangan dan para sarjana teknik yang baru bertugas sebagai Insinyur Proses di lapangan. Pengantar Penulis Saya masih teringat ketika lulus dari jurusan Teknik Kimia dan langsung berhadapan dengan dunia nyata (pabrik minyak dan gas) dan tergagap-gagap dalam menghadapi problem di lapangan yang menuntut persyaratan dari seorang insinyur proses dalam memahami suatu permasalahan dengan cepat, dan terkadang butuh kecerdikan – yang sanggup menjembatani antara teori pendidikan tinggi dan dunia nyata (=dunia kerja). Semakin lama bekerja di front line operation – dalam hal troubleshooting – semakin memperkaya kita dalam memahami permasalahan-permasalahan proses berikutnya. Menurut hemat saya, masalah-masalah troubleshooting proses di lapangan seringkali adalah masalah yang sederhana, namun terkadang menjadi ruwet karena tidak tahu harus dari mana memulainya. Hal ters...

Leak Off Test

Prinsipnya LOT (leak off test) dilakukan untuk menentukan tekanan dimana formasi mulai rekah. Tujuannya: 1. Menentukan MASP (Max. Allowable Surface Pressure). Yaitu batasan max surface pressure yg boleh kita terapkan selama drilling operation, tanpa mengakibatkan formasi rekah (fracture). 2. Dengan mengetahui MASP, berarti juga kita bisa mengetahui Max. mud weight yg boleh kita terapkan selama drilling operation, tanpa mengakibatkan formasi rekah (fracture). 3. Menentukan Kick Tolerance. Yaitu maximum kick size yg masih bisa kita tolerir untuk dihandle. Parameter ini nantinya juga berperan untuk menentukan depth casing shoe yang aman dari sudut pandang well control issue. 4. Mengecek kualitas sealing antara cement dengan casing Tanya - BGP HSESupv. BGP.HSESupv@petrochina Dear all Saat masih di rig dulu saya sering mendengar istilah leak off test. dimana step2nya kira kira sebagai berikut 1. Cementing Job 2. TSK ,masuk string dan bor kurang lebih 3 meter dibawah shoe. 3. dilakukan ...

Shutdown System

Apa yang membedakan antara PSD dan ESD? Secara umum keduanya berfungsi "membawa" sistem pemroses ke "keadaan yang lebih aman". Namun secara spesifik PSD lebih ditujukan kepada sebab sebab Process Specific seperti: Overpressure di bagian hilir kompressor, temperatur tinggi di heater untuk fuel gas, level yang terlau rendah di slug catcher, dst. Sementara ESD lebih ditujukan untuk menanggulangi dampak dari suatu kejadian yang sudah terjadi: misalnya gas yang telah bocor, kebakaran kecil di technical room, kebocoran minyak di pipeline, dst. Kedua jenis shutdown ini dapat pula dipicu oleh spurious trip atau gagalnya sistem shutdown tanpa sebab sebab yang diketahui dengan jelas. lebih rendah levelnya dari PSD ialah USD, atau Unit shutdown. Perlu dicamkan penamaan bisa berbeda beda antar company, misalnya ada yang menyebutnya sebagai ESD1, ESD2, ESD3 dan seterusnya, ada yang menyebutkannya sebagai ESD, PSD, USD dan seterusnya. Tidak penting, yang penting pahami betul fi...