Skip to main content

INPEX Vacant Positions

INPEX is a worldwide oil & gas exploration and production company based in Japan, involved in more than 70 projects across 26 countries. INPEX has been in Indonesia since 1966. As the pioneer of Indonesian deep-water exploration and the operator of Masela Block and Babar Selaru Block, INPEX has successfully discovered the Abadi giant gas field. Parallel with the activities, INPEX Organization is growing rapidly and currently we need the following positions :

ASSET SUPPORT (ASP)
1. Sr. Asset Geophysicist
2. Sr. Asset Geologist
3. Asset Geologist

BUSINESS INFRASTRUCTURE
4. Sr Staff Security & Compliance
5. Security & Compliance Staff 
6. IT Business Application Staff

COMMERCIAL
7. Commercial Senior Coordinator

COMMUNICATION & RELATIONS
8. Permit Liaison Staff
9. Sr Staff External Relations Formality

DRILLING
10. Completion Engineer
11. Offshore Drilling Operations Staff
FLNG
12. EPCI Technical Coordinator
13. Assistant FLNG Project Services Manager

FULLFIELD DEVELOPMENT (FFD)
General Precise for all Full Field Development Positions

The Abadi field is a large gas discovery located some 350 km east of Timor Island in Indonesian waters and 350 km north of Darwin, Australia.  It lies adjacent to the northern international boundary with Australia, in 400–800 m water depth.  The Masela Production Sharing Contract (PSC) was awarded to INPEX Masela as Operator with 100% interest in November 1998.  The discovery well, Abadi-1, was drilled and completed in late 2000.  INPEX has been planning for the development of the field through application of a 2.5mmtpa Floating LNG installation for a Stage 1.

The project is starting the FEED (Define) Phase of the Stage 1 FLNG Development, whereby the SURF FEED will be performed by a single Contractor and the FLNG FEED will be a design competition between two Consortia with the successful FEED Consortia proceeding through to EPC of the FLNG facility.

The Full Field Development (FFD) is to enter into Concept Select Phase during 2012 which will entail formation of a Full Field Development Team and implementation of Offshore/Onshore Surveys and Concept Select Consultancy Contracts for screening of multiple development options, including large scale FLNG.

14. Sr. Offshore Facilities Engineer
15. Sr. FLNG Engineer
16. Cost Engineer
17. Offshore Pipeline Engineer
18.  Geotechnical Coordinator
19. Contract Staff
20. Head of Onshore LNG
21. Sr. LNG Process Engineer
22.  Sr. Civil Engineer
23. Sr. Logistics Engineer
24. AMDAL/ESIA Specialist
25. Sr. Development Planning Engineer
26. HSE Engineer
27.  Schedule Planner


GAS AND CRUDE OIL MARKETING
28. Sr. Staff Gas Contract

GENERAL SERVICES
29. Sr. Staff Office Service
30. Sr. Staff Office Security
31. Technical Assistant

INTEGRATION
32. Subsea Engineer
33. Senior Production Engineer

INTERFACE/CHANGE/RISK MANAGEMENT
34. Sr. Staff – Interface Change Management
35. Staff – Interface Change Management
36. Sr. Interface Engineer  
37. FLNG Interface Coordinator
38. SURF Risk Coordinator
39. FLNG Risk Coordinator

INTERNAL BUSINESS AUDITOR
40. Sr. Internal Auditor
41. Internal Auditor

LOGISTIC BASE ENGINEERING
42. Principal Civil Engineer (Senior Structural Engineer)
              
PLANNING AND COORDINATION
43. Sr. Economist
44. Cost Engineer
45. Sr. Budget Controller
46. Sr. Cost Estimator
47. Budget Controller
48. Cost Estimator

PRE OPERATION (OPE)
49. Sr. Operations Recruitment and Training Planner
50. Sr. Plant Operations Engineer
51. Senior Operations Planner - Logistics and Maintenance
52. Senior Marine Engineer
53. Senior Commissioning and Operation Engineer

PROJECT SERVICE (PRJ)
54. Senior Contract Engineer
55. Senior Contracts Superintendent
56. Sr Logistics and Warehouse Staff

QHSE (QHS)
57. Safety Manager
58. Security Advisor
59. Senior Safety Specialist (for Technical Safety Design)
60. Lead QA/QC Engineer
61. QA/QC Engineer

SUBSURFACE DEVELOPMENT (SSD)
62. Senior Development Geologist
63. Petrophysicist
64. Sr. Reservoir Engineer
65. Sr. Petroleum Engineer
66. Petroleum Engineer
67. Operation Geophysicist
68. Sr. Staff Subsurface Data Management

HUMAN RESOURCES
69. Medical Doctor 
70. HR Service Staff (Compensation & Benefit)


For detail information, please log in to: http://career.inpex.co.id

Or simply drop your CV (put title of the position in email's subject) to: recruit_general@inpex.co.jp

Comments

  1. CARA JITU CEPAT LULUS TES TPA Oto BAPPENAS, PSIKOTES, TOEFL UJIAN SARINGAN MASUK CPNS/BUMN, S2 (PASCA SARJANA) UI,UGM,UNPAD, ITB,STAN, UI INTERNATIONAL (PASTI BISA)
    SPESIALIS PELATIHAN TPA/PSIKOTES/ TOEFL UI,UGM,UNPAD, ITB,STAN,UI INTERNATIONAL
    Ijin no:3789/PLSM/ I-133/VII/ 1995

    CARA JITU, CEPAT LULUS TES TPA, PSIKOTES &TOEFL (PASTI BISA)!
    Kami adalah Spesialis pelatihan TPA (Test Potensi Akademik)/PSIKOTES dan TOEFL memberikan pelayanan jasa pelatihan TPA dan TOEFL. Adapun pelatihan TPA, PSIKOTES dan TOEFL merupakan persyaratan Mutlak bagi Bapak/Ibu guna untuk mengikuti:
    - Tes untuk ujian saringan masuk CPNS dan BUMN
    - Tes untuk melanjutkan Pendidikan ke jenjang S1,Pasca Sarjana S2 untuk UMUM.
    - MEMBANTU REKAN-REKAN MAHASISWA/UMUM AGAR LULUS PSIKOTES DAN WAWANCARA KE PERUSAHAAN OIL AND GAS, BANK- BANK,CPNS, SERTA PERUSAHAAN MULTI NASIONAL LAINNYA DI SELURUH INDONESIA(SUDAH TERBUKTI).

    Note:
    - Biaya Belajar di Bayar di Muka
    - ± 80% peserta pelatihan Lulus tes S2,CPNS/BUMN di seluruh Indonesia
    (terbukti)

    HUBUNGI KAMI di:
    LYSSA,ST,MM / 021.71136838/ 0813 1879 2677
    Wisma Metropolitan 2,World Trade Centre, Jl. Jendral Sudirman,Jakarta

    ReplyDelete
  2. Dear Admin,
    Iklan lowongan Inpex ini expired nya kapan ya?
    Kok tidak ada date posted nya?

    ReplyDelete
  3. expired date-nya sampai kapan kalau boleh tau?

    ReplyDelete

Post a Comment

Popular posts from this blog

DOWNLOAD BUKU: THE TRUTH IS OUT THERE KARYA CAHYO HARDO

  Buku ini adalah kumpulan kisah pengalaman seorang pekerja lapangan di bidang Migas Ditujukan untuk kawan-kawan para pekerja lapangan dan para sarjana teknik yang baru bertugas sebagai Insinyur Proses di lapangan. Pengantar Penulis Saya masih teringat ketika lulus dari jurusan Teknik Kimia dan langsung berhadapan dengan dunia nyata (pabrik minyak dan gas) dan tergagap-gagap dalam menghadapi problem di lapangan yang menuntut persyaratan dari seorang insinyur proses dalam memahami suatu permasalahan dengan cepat, dan terkadang butuh kecerdikan – yang sanggup menjembatani antara teori pendidikan tinggi dan dunia nyata (=dunia kerja). Semakin lama bekerja di front line operation – dalam hal troubleshooting – semakin memperkaya kita dalam memahami permasalahan-permasalahan proses berikutnya. Menurut hemat saya, masalah-masalah troubleshooting proses di lapangan seringkali adalah masalah yang sederhana, namun terkadang menjadi ruwet karena tidak tahu harus dari mana memulainya. Hal ters...

Leak Off Test

Prinsipnya LOT (leak off test) dilakukan untuk menentukan tekanan dimana formasi mulai rekah. Tujuannya: 1. Menentukan MASP (Max. Allowable Surface Pressure). Yaitu batasan max surface pressure yg boleh kita terapkan selama drilling operation, tanpa mengakibatkan formasi rekah (fracture). 2. Dengan mengetahui MASP, berarti juga kita bisa mengetahui Max. mud weight yg boleh kita terapkan selama drilling operation, tanpa mengakibatkan formasi rekah (fracture). 3. Menentukan Kick Tolerance. Yaitu maximum kick size yg masih bisa kita tolerir untuk dihandle. Parameter ini nantinya juga berperan untuk menentukan depth casing shoe yang aman dari sudut pandang well control issue. 4. Mengecek kualitas sealing antara cement dengan casing Tanya - BGP HSESupv. BGP.HSESupv@petrochina Dear all Saat masih di rig dulu saya sering mendengar istilah leak off test. dimana step2nya kira kira sebagai berikut 1. Cementing Job 2. TSK ,masuk string dan bor kurang lebih 3 meter dibawah shoe. 3. dilakukan ...

Shutdown System

Apa yang membedakan antara PSD dan ESD? Secara umum keduanya berfungsi "membawa" sistem pemroses ke "keadaan yang lebih aman". Namun secara spesifik PSD lebih ditujukan kepada sebab sebab Process Specific seperti: Overpressure di bagian hilir kompressor, temperatur tinggi di heater untuk fuel gas, level yang terlau rendah di slug catcher, dst. Sementara ESD lebih ditujukan untuk menanggulangi dampak dari suatu kejadian yang sudah terjadi: misalnya gas yang telah bocor, kebakaran kecil di technical room, kebocoran minyak di pipeline, dst. Kedua jenis shutdown ini dapat pula dipicu oleh spurious trip atau gagalnya sistem shutdown tanpa sebab sebab yang diketahui dengan jelas. lebih rendah levelnya dari PSD ialah USD, atau Unit shutdown. Perlu dicamkan penamaan bisa berbeda beda antar company, misalnya ada yang menyebutnya sebagai ESD1, ESD2, ESD3 dan seterusnya, ada yang menyebutkannya sebagai ESD, PSD, USD dan seterusnya. Tidak penting, yang penting pahami betul fi...