Skip to main content

short-term vacancy - Solid Control Engineer

Dear all,
jika ada yang berminat untuk 'nyambi' di sela-sela waktu OFF, silakan apply untuk kebutuhan dibawah:
 
Solid Control Engineer (Short-term Project)
MB Century is a market leader and foremost provider of oil, gas and geothermal drilling services, with one of the most comprehensive and "best in market" fleets of land drilling rigs in the Asia - Pacific.  As a division of MB Group (MBPetroleum Services) headquartered in Oman, we strive to deliver 'lowest total well cost: safer, smarter - together with our clients'in mutually respectful commercial frameworks.

To support our drilling operation in Aceh, MB Century (PT Century Dinamik Drilling) is seeking  for  short-term temporary project for position of:
 
Solid Control Engineer (Short-term Freelance)
Duties:
  • Assessing our (Solids Control) Equipment (e.g (centrifuges, VFD, Shakers,desanders, desilters, etc) to our onshore Drilling rigs and its installations.
  • Rig Surveys for the installation of Solids Control Equipment and associated equipment.
  • Making report based on the on-location Assessment to our SC Equipment and its installation, including giving advice or best practice recommendation.
Requirements:
  1. BSc/BE in Engineering or equivalent (Mechanical preferred)
  2. More than 5 years experience in the same position.
  3. The candidate should have experience on Derrick Solid control Equipment
  4. Strong attention to detail and the ability to work well both independently as well as in a team environment.
  5. Must be able to communicate in English both written and oral.
  6. Must be computer literate (MS Office is compulsory)
Candidates should send their latest C.V to recruitmentindo@mbcentury.com / recruitmentindo[at]mbcentury.com within 3 days after this advertisement is announced; complete with full work experience details (Specify Oil, Gas or Geothermal Experience), training completed. Please be informed that these positions will be very short-term project (approx 5 days).
 
 

Comments

Popular posts from this blog

DOWNLOAD BUKU: THE TRUTH IS OUT THERE KARYA CAHYO HARDO

  Buku ini adalah kumpulan kisah pengalaman seorang pekerja lapangan di bidang Migas Ditujukan untuk kawan-kawan para pekerja lapangan dan para sarjana teknik yang baru bertugas sebagai Insinyur Proses di lapangan. Pengantar Penulis Saya masih teringat ketika lulus dari jurusan Teknik Kimia dan langsung berhadapan dengan dunia nyata (pabrik minyak dan gas) dan tergagap-gagap dalam menghadapi problem di lapangan yang menuntut persyaratan dari seorang insinyur proses dalam memahami suatu permasalahan dengan cepat, dan terkadang butuh kecerdikan – yang sanggup menjembatani antara teori pendidikan tinggi dan dunia nyata (=dunia kerja). Semakin lama bekerja di front line operation – dalam hal troubleshooting – semakin memperkaya kita dalam memahami permasalahan-permasalahan proses berikutnya. Menurut hemat saya, masalah-masalah troubleshooting proses di lapangan seringkali adalah masalah yang sederhana, namun terkadang menjadi ruwet karena tidak tahu harus dari mana memulainya. Hal tersebut

[Lowongan Kerja] QA System Coordinator, Pipe Yard Coordinator, Customer Assistant Coordinator

With over 30 years' experience, Air Energi are the premier supplier of trusted expertise to the oil and gas industry. Headquartered in Manchester UK, Air Energi has regional hubs in Houston, Doha, Singapore and Brisbane. We have offices in 35 locations worldwide, experience of supply for 50 countries worldwide, and through our company values: Safe, knowledgeable, innovative, passionate, inclusive, and pragmatism, WE DELIVER, each and every time. At the moment we are supporting a multinational OCTG processing operation in seeking of below positions: 1.       QA System Coordinator Coordinates Quality System development in plant, directing the implementation of specifications and quality norms. Administers complaints regarding non-conformities and provides quality process information in support of decision making. Develops the necessary procedures, instructions and specifications to ensure Quality System conformity. Coordinates and organizes the execution of interna

Electric Power Factor

Katanya jika power factor kecil maka tidak effisien pada generator, trafo, dan system distribusi? Kondisinya begini, plant saya punya electric generator sendiri (tidak beli dari PLN). Pembangkit berupa 5 buah gas turbin generator masing masing 2 MW. Sebagian besar (hampir semua) konsumen listrik adalah motor induksi sehingga power factor kecil kisaran 0.5-0.6 (terbaca di generator control panel). Apakah dengan meningkatkan power factor maka: 1 Saya bisa meningkatkan effisiensi energi listrik saya (baca:menurunkan konsumsi fuel gas untuk generator)? 2. Saya bisa mengurangi jumlah generator yang beroperasi? (karena katanya dengan peningkatan power factor maka tidak diperlukan kapasitas pembangkit yang besar) Tanya - Muchlis Nugroho Numpang tanya tentang power factor. Katanya jika power factor kecil maka tidak effisien pada generator, trafo, dan system distribusi? Kondisinya begini, plant saya punya electric generator sendiri (tidak beli dari PLN). Pembangkit berupa 5 buah gas turbin