Skip to main content

Vacancy in Power Plant Project

PT. AMYTHAS is a leading Project Management and Supervision Consultant in Power Plant, Infrastructure currently searching for highly qualified candidate for the following position:

1. Project Manager/Team Leader
Requirement:
- Min. S1 in Engineering
- Having experience at least 10 years in Power Plant Project in the same position preferably

2. Balance of Plant (BOP) Engineer
Requirement:
- Min. S1 in Mechanical Engineering
- Having experience at least 8 years in Power Plant Project as a BOP Engineer

3. Turbine Engineer
Requirement:
- Min. S1 in Mechanical Engineering
- Having experience at least 8 years in Power Plant Project as a Turbine Engineer

4. Boiler Engineer
Requirement:
- Min. S1 in Mechanical Engineering
- Having experience at least 8 years in Power Plant Project as a Boiler Engineer

5. Instrument and Control (I & C) Engineer
Requirement:
- Min. S1 in Electrical Engineering
- Having experience at least 8 years in Power Plant Project as a I & C Engineer

6. Plant Electrical Engineer
Requirement:
- Min. S1 in Electrical Engineering
- Having experience at least 8 years in Power Plant Project as a Plant Electrical Engineer

7. Civil Engineer
Requirement:
- Min S1 in Engineering
- Having experience at least 8 years in Power Plant Project as a Civil Engineer

If you meet the requirement above please send your complete CV to:

solehudin@amythas.com or soleh_hudin@yahoo.com

Only shortlist candidate will be notified.

NOTE: PLEASE STATE YOUR EXISTING SALARY AND EXPECTED SALARY

Posting : 21 September 2012

Comments

Popular posts from this blog

DOWNLOAD BUKU: THE TRUTH IS OUT THERE KARYA CAHYO HARDO

  Buku ini adalah kumpulan kisah pengalaman seorang pekerja lapangan di bidang Migas Ditujukan untuk kawan-kawan para pekerja lapangan dan para sarjana teknik yang baru bertugas sebagai Insinyur Proses di lapangan. Pengantar Penulis Saya masih teringat ketika lulus dari jurusan Teknik Kimia dan langsung berhadapan dengan dunia nyata (pabrik minyak dan gas) dan tergagap-gagap dalam menghadapi problem di lapangan yang menuntut persyaratan dari seorang insinyur proses dalam memahami suatu permasalahan dengan cepat, dan terkadang butuh kecerdikan – yang sanggup menjembatani antara teori pendidikan tinggi dan dunia nyata (=dunia kerja). Semakin lama bekerja di front line operation – dalam hal troubleshooting – semakin memperkaya kita dalam memahami permasalahan-permasalahan proses berikutnya. Menurut hemat saya, masalah-masalah troubleshooting proses di lapangan seringkali adalah masalah yang sederhana, namun terkadang menjadi ruwet karena tidak tahu harus dari mana memulainya. Hal tersebut

[Lowongan Kerja] QA System Coordinator, Pipe Yard Coordinator, Customer Assistant Coordinator

With over 30 years' experience, Air Energi are the premier supplier of trusted expertise to the oil and gas industry. Headquartered in Manchester UK, Air Energi has regional hubs in Houston, Doha, Singapore and Brisbane. We have offices in 35 locations worldwide, experience of supply for 50 countries worldwide, and through our company values: Safe, knowledgeable, innovative, passionate, inclusive, and pragmatism, WE DELIVER, each and every time. At the moment we are supporting a multinational OCTG processing operation in seeking of below positions: 1.       QA System Coordinator Coordinates Quality System development in plant, directing the implementation of specifications and quality norms. Administers complaints regarding non-conformities and provides quality process information in support of decision making. Develops the necessary procedures, instructions and specifications to ensure Quality System conformity. Coordinates and organizes the execution of interna

Electric Power Factor

Katanya jika power factor kecil maka tidak effisien pada generator, trafo, dan system distribusi? Kondisinya begini, plant saya punya electric generator sendiri (tidak beli dari PLN). Pembangkit berupa 5 buah gas turbin generator masing masing 2 MW. Sebagian besar (hampir semua) konsumen listrik adalah motor induksi sehingga power factor kecil kisaran 0.5-0.6 (terbaca di generator control panel). Apakah dengan meningkatkan power factor maka: 1 Saya bisa meningkatkan effisiensi energi listrik saya (baca:menurunkan konsumsi fuel gas untuk generator)? 2. Saya bisa mengurangi jumlah generator yang beroperasi? (karena katanya dengan peningkatan power factor maka tidak diperlukan kapasitas pembangkit yang besar) Tanya - Muchlis Nugroho Numpang tanya tentang power factor. Katanya jika power factor kecil maka tidak effisien pada generator, trafo, dan system distribusi? Kondisinya begini, plant saya punya electric generator sendiri (tidak beli dari PLN). Pembangkit berupa 5 buah gas turbin