Skip to main content

(Lowongan) Untuk project T&I Platform and Pipeline

1. Construction Superintendent:
    Degree or Diploma in Engineering, 15-17 yr exp in transportation & installation platform/pipeline, 4 yr as Construction Supt.
 
2. Senior Pipeline Engineer:
   Degree or Diploma in Engineering, 15-17 yr exp in transportation & installation platform/pipeline, 2 similar projects as pipeline eng.
 
3. Barge Master / Marine Captain
   Certificate of Competency in aacordance to SCTW '95 Master Regulation, II/2 Master Unlimited (Foreign Going Master certificates), 15 yr exp. in O&G
 
4. Senior Field Engineer/Installation Engineer
    Degree or Diploma in Engineering, 11-12 yr exp in transportation & installation platform/pipeline, 2 similar projects as pipeline eng.
 
5. Senior Project Engineer
    Degree or Diploma in Engineering, 8-10 yr exp in transportation & installation platform/pipeline.
 
6. Senior Structural Engineer
Degree or Diploma in Engineering, 15-17 yr exp in transportation & installation platform/pipeline, 2 yr exp as senior structural eng.
 
7. HSE Manager
   Diploma in Occupational Safety Health (OSH), 8 yr exp.
 
8. Senior Naval Architect
    Degree in Naval Engineering, 8-10 yr exp  transportation & installation platform/pipeline. 2 similar works as naval architecture
 
9. Senior Quality Assurance
   Degree in Mechanical/Metallurgical/Welding Engineering, IRCA (UK) Lead Assessor or equivalent.8 yr exp in O&G
 
Silahkan kirim Lamaran & CV ke saya nanti saya forward ke yg bersangkutan.
 

Comments

Popular posts from this blog

DOWNLOAD BUKU: THE TRUTH IS OUT THERE KARYA CAHYO HARDO

  Buku ini adalah kumpulan kisah pengalaman seorang pekerja lapangan di bidang Migas Ditujukan untuk kawan-kawan para pekerja lapangan dan para sarjana teknik yang baru bertugas sebagai Insinyur Proses di lapangan. Pengantar Penulis Saya masih teringat ketika lulus dari jurusan Teknik Kimia dan langsung berhadapan dengan dunia nyata (pabrik minyak dan gas) dan tergagap-gagap dalam menghadapi problem di lapangan yang menuntut persyaratan dari seorang insinyur proses dalam memahami suatu permasalahan dengan cepat, dan terkadang butuh kecerdikan – yang sanggup menjembatani antara teori pendidikan tinggi dan dunia nyata (=dunia kerja). Semakin lama bekerja di front line operation – dalam hal troubleshooting – semakin memperkaya kita dalam memahami permasalahan-permasalahan proses berikutnya. Menurut hemat saya, masalah-masalah troubleshooting proses di lapangan seringkali adalah masalah yang sederhana, namun terkadang menjadi ruwet karena tidak tahu harus dari mana memulainya. Hal tersebut

[Lowongan Kerja] QA System Coordinator, Pipe Yard Coordinator, Customer Assistant Coordinator

With over 30 years' experience, Air Energi are the premier supplier of trusted expertise to the oil and gas industry. Headquartered in Manchester UK, Air Energi has regional hubs in Houston, Doha, Singapore and Brisbane. We have offices in 35 locations worldwide, experience of supply for 50 countries worldwide, and through our company values: Safe, knowledgeable, innovative, passionate, inclusive, and pragmatism, WE DELIVER, each and every time. At the moment we are supporting a multinational OCTG processing operation in seeking of below positions: 1.       QA System Coordinator Coordinates Quality System development in plant, directing the implementation of specifications and quality norms. Administers complaints regarding non-conformities and provides quality process information in support of decision making. Develops the necessary procedures, instructions and specifications to ensure Quality System conformity. Coordinates and organizes the execution of interna

Electric Power Factor

Katanya jika power factor kecil maka tidak effisien pada generator, trafo, dan system distribusi? Kondisinya begini, plant saya punya electric generator sendiri (tidak beli dari PLN). Pembangkit berupa 5 buah gas turbin generator masing masing 2 MW. Sebagian besar (hampir semua) konsumen listrik adalah motor induksi sehingga power factor kecil kisaran 0.5-0.6 (terbaca di generator control panel). Apakah dengan meningkatkan power factor maka: 1 Saya bisa meningkatkan effisiensi energi listrik saya (baca:menurunkan konsumsi fuel gas untuk generator)? 2. Saya bisa mengurangi jumlah generator yang beroperasi? (karena katanya dengan peningkatan power factor maka tidak diperlukan kapasitas pembangkit yang besar) Tanya - Muchlis Nugroho Numpang tanya tentang power factor. Katanya jika power factor kecil maka tidak effisien pada generator, trafo, dan system distribusi? Kondisinya begini, plant saya punya electric generator sendiri (tidak beli dari PLN). Pembangkit berupa 5 buah gas turbin