Skip to main content

Required

ELECTRICAL PROJECT ENGINEER

Job descriptionYou will be part of our team within the electrical group and mainly work on minor projects within the Oil & Gas and wind power industry. You will be involved in design of control and distribution panels.
Travelling both site and offshore can be anticipated.

Qualifications:• Graduated Engineer or Certified Electrician/Technician
• Experience with explosion proof enclosures
• Knowledge of PC Schematic
• Writing and speaking high standard English
• Good health for work in the Marine/Offshore environment
• Minimum three years of experience with project engineering.

Personal qualifications:You will be part of a dynamic worldwide team of engineers which will require your ability to cooperate with local engineers as well as cooperate with our engineers around the world.

You have a personal drive and can work independently and well-structured on various projects in a busy organisation.


ELECTRICAL ENGINEER


Job description
We are looking for employees at all position levels and with experience in:
  • Lead engineers with profound oil / gas experience and within the disciplines in the project.  This function also has a leading technical role for other project engineers
  • Generalists who are familiar with most of the fields within the discipline. 
We are looking for employees for engineering tasks in the following areas:
Condition monitoring / vibration monitoring on structures and rotating equipment
Turbine and generator upgrade of controller and controller system.
Primary tasks: 
  • System description and technical specifications
  • Making of cable lists, signal lists, equipment lists, component lists
  • Equipment layout, cable layout
  • Data sheets
  • Inter-connection drawings, block diagrams, single line diagram
  • Control panel design (specification)
  • General project documentation 
Qualifications:
  • Knowledge of controllers and monitoring of / from industrial facilities
  • Knowledge of and experience with the tasks listed above
  • Knowledge of ATEX/EX 
Additionally, for condition monitoring:
  • Experience with network communication (Fibre-optic broadband/Ethernet/Modbus) 
Additionally, for generator and turbine:
  • PLC/SCADA, control – design, I/O-lists (no coding)
  • Serial communication (Modbus and similar) 
As the project is managed in cooperation with our offices in Norway, Singapore and Denmark, you must be willing to travel.
Qualifications: 
  • We expect you to have an education as either a graduate engineer, a Bachelor of Technology Management and Marine Engineering, an electrical technician, a certified electrician or similar.
  • Primarily experience from the machine/process industry
  • Preferably with experience from the oil & gas industry
  • For the position as lead engineer, an additional minimum of 5 years experience from the offshore industry is required
English in speech and writing

Should you be interested, please let me know, along with an indication of your availibility and an update of your CV and I will gladly forward your details to the relevant parties for consideration
CV submissions to:

If you have any colleagues who may be interested in available positions, please feel free to circulate this information
Best regards

David Midwood
Marketing Director
Browning and Henderson International Ltd.
+44 (0)1258 830322

Comments

Popular posts from this blog

DOWNLOAD BUKU: THE TRUTH IS OUT THERE KARYA CAHYO HARDO

  Buku ini adalah kumpulan kisah pengalaman seorang pekerja lapangan di bidang Migas Ditujukan untuk kawan-kawan para pekerja lapangan dan para sarjana teknik yang baru bertugas sebagai Insinyur Proses di lapangan. Pengantar Penulis Saya masih teringat ketika lulus dari jurusan Teknik Kimia dan langsung berhadapan dengan dunia nyata (pabrik minyak dan gas) dan tergagap-gagap dalam menghadapi problem di lapangan yang menuntut persyaratan dari seorang insinyur proses dalam memahami suatu permasalahan dengan cepat, dan terkadang butuh kecerdikan – yang sanggup menjembatani antara teori pendidikan tinggi dan dunia nyata (=dunia kerja). Semakin lama bekerja di front line operation – dalam hal troubleshooting – semakin memperkaya kita dalam memahami permasalahan-permasalahan proses berikutnya. Menurut hemat saya, masalah-masalah troubleshooting proses di lapangan seringkali adalah masalah yang sederhana, namun terkadang menjadi ruwet karena tidak tahu harus dari mana memulainya. Hal tersebut

[Lowongan Kerja] QA System Coordinator, Pipe Yard Coordinator, Customer Assistant Coordinator

With over 30 years' experience, Air Energi are the premier supplier of trusted expertise to the oil and gas industry. Headquartered in Manchester UK, Air Energi has regional hubs in Houston, Doha, Singapore and Brisbane. We have offices in 35 locations worldwide, experience of supply for 50 countries worldwide, and through our company values: Safe, knowledgeable, innovative, passionate, inclusive, and pragmatism, WE DELIVER, each and every time. At the moment we are supporting a multinational OCTG processing operation in seeking of below positions: 1.       QA System Coordinator Coordinates Quality System development in plant, directing the implementation of specifications and quality norms. Administers complaints regarding non-conformities and provides quality process information in support of decision making. Develops the necessary procedures, instructions and specifications to ensure Quality System conformity. Coordinates and organizes the execution of interna

Electric Power Factor

Katanya jika power factor kecil maka tidak effisien pada generator, trafo, dan system distribusi? Kondisinya begini, plant saya punya electric generator sendiri (tidak beli dari PLN). Pembangkit berupa 5 buah gas turbin generator masing masing 2 MW. Sebagian besar (hampir semua) konsumen listrik adalah motor induksi sehingga power factor kecil kisaran 0.5-0.6 (terbaca di generator control panel). Apakah dengan meningkatkan power factor maka: 1 Saya bisa meningkatkan effisiensi energi listrik saya (baca:menurunkan konsumsi fuel gas untuk generator)? 2. Saya bisa mengurangi jumlah generator yang beroperasi? (karena katanya dengan peningkatan power factor maka tidak diperlukan kapasitas pembangkit yang besar) Tanya - Muchlis Nugroho Numpang tanya tentang power factor. Katanya jika power factor kecil maka tidak effisien pada generator, trafo, dan system distribusi? Kondisinya begini, plant saya punya electric generator sendiri (tidak beli dari PLN). Pembangkit berupa 5 buah gas turbin